The Building of the Energetic 

Built by Ralph Bird between September 1990 and February 1991
Here are a collection of photographs taken during the various stages of construction at Devoran.
 

"Energetic" still with her frames in place. Notice the ribs extending beyond the gunwale, these will be trimmed before the frames are removed.

Image of the Energetic during construction.
 
Image of the Energetic during construction.

Placing the bow ribs in place, is not an easy task, very little room to work, and the acute angle of the rib tests the skills of the shipwright.  

 

Amidships there is more room to work, but bending the ribs into place is hot work as the timbers come red hot straight from the steaming box.

Image of the Energetic during construction.
 
Image of the Energetic during construction.

All the ribs are now in place, and for the first time the general shape of the gig can be seen for the first time